Hefbrug, Delftzijl (NL)

We have blasted and conserved a lift bridge in Delftzijl.

The scope of the work broadly consisted of:

  • Blasting mounting supports and separation berm including 3 layers of coating system
  • Dust-free blasting of an epoxy wear layer to a minimum cleanliness of Sa 2.5. Then we applied a wear layer by means of an epoxy primer layer, membrane and a sprinkled top layer
  • Conservation of the deck, approximately 700 m²
  • Preservation of the counterweight, approximately 525 m²
  • Work tent of 10 meters wide

 

Terug naar overzicht