Hefbrug, Delftzijl (NL)
We have blasted and conserved a lift bridge in Delftzijl.
The scope of the work broadly consisted of:
- Blasting mounting supports and separation berm including 3 layers of coating system
- Dust-free blasting of an epoxy wear layer to a minimum cleanliness of Sa 2.5. Then we applied a wear layer by means of an epoxy primer layer, membrane and a sprinkled top layer
- Conservation of the deck, approximately 700 m²
- Preservation of the counterweight, approximately 525 m²
- Work tent of 10 meters wide
Terug naar overzicht